Our SEiW under construction.
On the left hand side, the engine has been stripped of redundant components
and suspended on to the hoist before mounting on the engine stand. The
gearbox is in the foreground.
Andrew
assembling the engine stand. The MT 75 gearbox in the foreground still has
the anti vibration mount fitted this has to be removed when fitting the
Westfield prop shaft
Now
mounted on the engine stand so that we can remove the sump and replace it
with a modified one from Westfield. The hoist has been slackened but not
disconnected whilst we cautiously check if the stand will take the weight